The intervention includes the redevelopment of an existing warehouse and the expansion to house the logistics center of the multinational R.S. Components S.p.a.
The existing warehouse is intended for an automatic conveyor system for order management, picking and packaging on two floors; a third level is intended for support spaces.
The extension houses the warehouse served by a high automation trilateral shifter.
RS Components S.p.A.
Vimodrone (MI)
2000
Integrated design and supervision of works for: architecture, structures and MEP Engineering
Redevelopment: sqm 7800 - Enlargement: sqm 2000